Residential and Commercial Galleries

Just a Small Sampling of Some of Our Projects in the Virginia, Washington D.C., and North Carolina Markets.

With two to five projects weekly, we have completed over a thousand natural and engineered stone installations since we started working in the home improvement industry. That includes not only residential but also commercial projects in which we were able to fulfill some very sophisticated customers’ requirements. One such a job that we proud ourselves of is a renovation of the Richmond city landmark – Jefferson hotel.

Still Not Sure What countertop is right for you?

Top Engineered Stone Brands

Our Process

Start by getting a FREE* estimate or visiting our showroom.
Our advanced technology and competitive prices meet your kitchen, bathroom, fireplace, floors, walls, or stairs needs.
1
2
3
4
5
6

FREE* Estimate

When we receive your request for a free estimate, we try to contact you as soon as possible and schedule an appointment at your home or business. To ensure accurate measurement, please have your countertops cleared and move away anything that can obstruct an access to backsplash or sink.

Pick Your Stone

You are welcome anytime to our showroom where you will be able to see the full slabs of stones and pick the exact one that will be installed in your home. If you have a special request and would like a material that we do not have in stock, we will work with our trusted vendors and will have it delivered to our shop usually between two and seven days.

Pick Edge Profile

For some projects, you will also have to decide on an edge profile that you would like to have. Please go to our “Edge Profile” webpage to browse the available options. We have a broad selection of standard and premium edges.

Browse Edge Profiles >

Set an installation date

After making a stone selection, the installation date will be set up. It usually takes three to five days to have your stone cut and prepared for this next phase. For glass shower enclosures that time is a bit longer: 2 weeks for glass enclosures only, and 4 weeks for a complete shower (glass enclosure, floor, and walls.)

Installation day

The installation itself is performed in one day. You would have to clear your countertops, remove the top drawers, and empty an under the sink cabinet for kitchen countertops installation, or clear the shower, bathtub, and vanity tops for bathroom upgrades. In only a few hours, your kitchen, bathroom, or fireplace will look like the one you always dreamed about.

Enjoy!

We are here to exceed your expectations. We value your investment and always provide the best installation services possible. We stand behind our work. Our team of is dedicated to guiding you through the process to ensure your total satisfaction.

*24 hours cancellation or reschedule required. If a project is not ready to be measured (cabinets are not fully installed, sink or configuration will change etc.) – $150.00 FEE WILL APPLY* To ensure accurate measurement, please have your countertops cleared and move away anything that can obstruct an access to backsplash or sink.

Scroll to Top